Impact of Batching Plant on Construction Timelines and Optimization Measures
AS-3.5 is a hot-selling model of Aimix self-loading concrete mixers, which was recently exported to Indonesia and was well received by customers. Our efficient stock preparation, transport process, product performance, and after-sales service impressed the customers. Below, we will detail these aspects that received praise from our customers.

Praise Stock Preparation Process – Efficient and Accurate
Every step of the way, from assembly and quality checks to test runs by professionals, is done precisely and quickly. High efficiency shortens lead times and ensures that customers receive their equipment on time. Here are the pictures of testing the self-loader mixer.
Praise Product Performance – Reliable and Efficient
AS-3.5 concrete self loading mixer has got the customers’ satisfaction after it is put into use. Contractors and construction professionals have highlighted several key benefits of the machine, making it the preferred choice on their sites.

Time and Cost Savings:
The self-loading function and the efficient mixing process not only reduce labor costs but also shorten time.
Consistency and Quality:
Aimix self-loading concrete mixers ensure consistent production of high-quality concrete for the quality projects.
Versatility:
The machine’s ability to function as a loader, mixer, and transport vehicle makes it highly versatile. Customers can use it for a variety of tasks on construction sites.
Durability and Reliability:
The machine is able to withstand harsh working conditions and is reliable in both wind and rain.
Praise Shipping Process – Safe and Fast
Transporting heavy, delicate machinery like the AS-3.5 self-loader mixer can be a complex task, but Aimix has perfected the process. We pack and secure it with hard-wearing packaging materials and then load it in containers to prevent the equipment from receiving wear and tear. Customers have praised Aimix for the ability to deliver mixers quickly and safely, allowing construction projects to run smoothly.
Praise After-sales Service – Well-established and Professional
Aimix’s comprehensive and professional after-sales service is a commitment to customer satisfaction. Customers appreciate the comprehensive support provided by Aimix’s professional service team, which includes technical training, routine maintenance, and timely provision of spare parts.
Aimix self-loading concrete mixers have received positive feedback from customers through meticulous stock preparation, safe and fast transport, reliable product performance, and professional after-sales service. Click here to see more cases!
